As our waterfront construction continues in a portion of the Menominee River adjacent to the shipyard, we need to limit river traffic in this specific location for a few minutes each weekday afternoon from 4 – 5 p.m. CT, so that large sections of bedrock can be broken up and safely removed.

Our work along our waterfront must be accomplished from late spring to mid-Autumn.  We have coordinated with the Army Corps of Engineers, local law enforcement, the U.S. Coast Guard, the cities of Marinette and Menominee, and the Wisconsin Department of Natural Resources to facilitate our activities in a safe and responsible manner.

This work is required for FMM to build and deliver larger vessels under contract with the U.S. Navy.  We appreciate your patience and endeavor to minimize the impact to those who enjoy the Menominee River as much as we do.  Keep in mind that the Menominee River will be open for all traffic and activities every day, except for a few minutes each weekday afternoon. We plan to limit construction activities to weekdays only, and we will observe holidays.

Check out the detailed maps below to determine which areas of the Menominee River will be temporarily restricted during times of construction and blasting.”

Click here to see a demonstration of the types of activities we plan to use.

2021 TIMELINE

WHERE ARE WE DOING IT?

Blasting location along Menominee River at Fincantieri Marinette Marine

RESTRICTED AREA

Boats may pass on the north side of barges without going beyond the red channel buoys

SAFETY ZONES

  • Safety zone for people outside is 500 feet shown in red.
  • Safety zone for boaters is 1000 feet shown in yellow.
  • Safety zone for swimmers and jet skis is from Hwy 41 to Ogden St bridge.

WHAT TO LOOK FOR

A sign on North side of the barge where boats may pass safely.

A “DO NOT ENTER” sign will be posted on the South side of the barge where boats may not pass per USCG.

Informational signs will be posted at boat launch ramps and marinas.

Brief closures of the river within 1000 feet of Marinette Marine*.

*No swimmers or jet skis are allowed between the bridges during closures.

NON-WORK DAYS

HOLIDAYS

May 31
Memorial Day

July 5
Independence Day Observed

September 6
Labor Day

November 25
Thanksgiving Day

FISHING TOURNAMENTS

Since our daily operation will
upset the normal flow of river
traffic it is our intention to shut
down operations during fishing
tournaments & other events.